Fury Announces Initial Mineral Resource Estimate for the Sakami Gold Project in Quebec
Highlights:
“The Sakami mineral resource estimate is an exciting portfolio milestone and starting point for the project,” commented Tim Clark, CEO of Fury Gold Mines. “Less than a year from acquiring Sakami from Quebec Precious Metals, the Fury team identified a path to growing portfolio ounces, leveraging this quality asset situated in an established mining region with excellent access to infrastructure. These 825,000 ounces are a solid base from which we can grow, demonstrating significant expansion potential and paves the way to growing our ounces within the Eeyou Istchee James Bay region.”
”The summer 2025 drill program at Sakami expanded upon and confirmed the continuity and grades encountered in historical drilling to the stage where we can release this initial resource. The broad widths of moderate grade gold with a higher-grade gold core encountered in the 2025 drilling campaign all remain open to further expand on this inferred resource. In fact, the current optimized pit encompasses all the drilling completed to date at La Pointe Extension,” commented Bryan Atkinson, P.Geo., SVP Exploration of Fury.
Initial MRE Overview
The initial MRE (Table 1) was prepared by Olivier Vadnais-Leblanc, Geologist with SGS Geological Services in accordance with the 2014 Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) Definition Standards and Canadian National Instrument 43-101 (“NI 43-101”). SGS is independent of Fury and the Project.
The following is the current Mineral Resource Estimate as at November 11, 2025 (the “Effective Date”), which incorporates 17,719m of total drilling conducted by Quebec Precious Metals (14,754m) and Fury (2,965m).
Expansion Potential
The La Pointe Extension resource remains open in all directions (Figure 1) with near-term opportunity to expand the MRE to the northeast and southwest as well as beneath the optimized open pit where it is limited to 175m below surface (Figure 1).
Considerable upside to expand beyond the existing in-pit resources to add 8.1Mt to 14.7Mt grading between 1.57 g/t Au and 1.11 g/t Au (see Table 3), of which 35,487m of historical drilling has been completed. The potential quantity and grade are conceptual in nature, that there has been insufficient exploration to define a mineral resource and that it is uncertain if further exploration will result in the target being delineated as a mineral resource.
Figure 2 shows the location of the outlined La Pointe Extension MRE (green) and the outlined exploration expansion target opportunity, which lays within the Sakami Reservoir (between peninsulas), approximately 300m from surface. More work needs to be completed to confirm the resource potential.
About the Sakami Project
The 100% owned Sakami project covers approximately 14,250 hectares (ha) or 142.5 square kilometres (km), located 30km to the east of the paved Billy Diamond Highway. The Project straddles the prospective structural corridor marking the contact between the Opinaca and La Grande Geological sub-provinces, where gold mineralization has been identified over a distance of more than 23km. Gold mineralization is located at the base of a sulphide-rich horizon within a zone of intense pervasive silicification located along a regional shear zone, marking the contact between the two geological sub-provinces.
A total of seven diamond drill holes totaling approximately 3,685m were completed during the 2025 campaign. Six holes targeted the down plunge and along strike extensions of previously identified gold mineralization across 650m of strike length at the La Pointe Extension target. Historical drilling has intercepted gold mineralization across widths of up to 75m and to a depth of up to 500m below surface. All 2025 drill holes completed at La Pointe Extension intercepted zones of intense silicification with sulphide mineralization containing broad zones of gold mineralization in two sub-parallel zones with higher grade cores.
A technical report will be prepared (the “Technical Report”) by Qualified Persons in accordance with the requirements of NI 43-101 and will be filed on SEDAR+ (sedarplus.ca) within 45 days of this press release.
Qualified Person
Valerie Doyon, P.Geo, Senior Project Geologist at Fury, is a “qualified person” within the meaning of Canadian mineral projects disclosure standards instrument 43-101 and has reviewed and approved the technical disclosures in this press release.
The November 11, 2025 Mineral Resource Estimate has been prepared by Olivier Vadnai-Leblanc, P. Geo., Geologist with SGS Geological Services, a “qualified person” within the meaning of Canadian mineral projects disclosure standards instrument 43-101
About Fury Gold Mines Limited
Fury Gold Mines Limited is a well-financed Canadian-focused exploration company positioned in two prolific mining regions across Canada and holds an 11.3 million common share position in Dolly Varden Silver Corp (12.9% of issued shares). Led by a management team and board of directors with proven success in financing and advancing exploration assets, Fury intends to grow its multi-million-ounce gold platform through rigorous project evaluation and exploration excellence. Fury is committed to upholding the highest industry standards for corporate governance, environmental stewardship, community engagement and sustainable mining. For more information on Fury Gold Mines, visit www.furygoldmines.com.
Neither the TSX nor its Regulations Services Provider (as that term is defined in the policies of the TSX) accepts responsibility for the adequacy or accuracy of this news release.
Forward-Looking Statements and Additional Cautionary Language
This release includes certain statements that may be deemed to be "forward-looking statements" within the meaning of applicable securities laws, which statements relate to the future exploration operations of the Company and may include other statements that are not historical facts. Forward-looking statements contained in this release primarily relate to statements that suggest that future work at Sakami will potentially increase or upgrade the inferred resources.
Although the Company believes that the assumptions and expectations reflected in those forward-looking statements were reasonable at the time such statements were made, there can be no certainty that such assumptions and expectations will prove to be materially correct. Mineral exploration is a high-risk enterprise.
Readers should refer to the risks discussed in the Company’s Annual Information Form and MD&A for the year ended December 31, 2024 and subsequent continuous disclosure filings with the Canadian Securities Administrators available at www.sedarplus.ca and the Company’s Annual Report available at www.sec.gov. Readers should not place heavy reliance on forward-looking information, which is inherently uncertain.
Swiss Resource Capital AG
Poststrasse 1
CH9100 Herisau
Telefon: +41 (71) 354-8501
Telefax: +41 (71) 560-4271
http://www.resource-capital.ch
![]()